Kayıtlar

B4

Resim
 

B1

Resim
 

Ceiling CAD Drawings

Resim
 

B3 Suspended ceiling sketch

Resim
 

Work to existing building part 2

Resim
    ADAPTATION OF BUILDINGS A. Major Changes (Structural Alterations)   1. Forming an Opening        1.1. Removing an internal wall in a load-bearing wall system 1.2. Removing a part of a floor 2. Creating another level 2.1. Inserting a mezzanine floor Load bearing Wall System Metal/wood-stud walls Lightweight masonry walls   Existing beams with hanger Wood subfloor Mezzanine structure  Wood Steel

Lecture 2 Surveying

Resim
 Surveying To determine the geometric organization of the plan and dimensions of the space to make initial design studies  - To make restoration of the building.  - To rebuild the demolished existing and ruined building. Drafting Equipment: Pencil, colored pen  Eraser Hard mounting pad  Triangles -Compass  Grid A3 size papers Measuring Equipment:  - Folding wooden ruler  -Clear hose  -Fish hook  -Adjustable protractor  - Steel 5m & 20 m. ruler  -Laser meter  -Plumb line  -Water level  -Plumb-level: Nivo, Mira -Theodolite (Teodolit) 1. Taking Photographs of the Space ( should be opposite corner ) 2. Preparing Sketches Preparing Ceiling Plan Sketches Preparing Section Sketches Preparing Exterior Facade Elevations 3. Taking Measurements